Engineering project management

Every project, person and billable hour in one place

Keystone gives engineering firms one shared plan: task boards, Gantt timelines, team load, timesheets, site visits and equipment, with reports your clients can read.

  • No card needed
  • Civil, electrical, mechanical and controls teams
  • Works on site from a phone
  • 5roles, from owner to client viewer
  • 12 wkteam load ahead, per person
  • 8report charts, each exports to CSV
  • 5 minidle time before the screen locks

Made for consulting engineers, design-build contractors, utilities, controls integrators and in-house engineering teams.

A week on a project

Pick a day, or scroll, and the screen follows a team through its week.

Board, Substation Upgrade Phase 2

To do 3

SUB-41Relay settings review
ElectricalAK
SUB-44Cable schedule rev C
6 h est.GL

In progress 2

SUB-37Protection one-line
ElectricalAK
SUB-39SCADA point list
BlockedSM

Review 2

SUB-33Grounding calc
14 / 12 hDO
SUB-35Breaker spec
Due ThuHQ

Done 18

SUB-30Site walkdown
ApprovedTB
Planned hours against capacity, next 8 weeks
Nov 9162330Dec 7142128 Amanda Keller384644362824120 Derek Owens40383026261680 Sarah Mitchell302836423824106 Brian Adams14162224181240 Logan Brooks3636383028221410 Owen Scott610122034382816
LightFull, 40 hOver capacity
Pump Station 4, commissioning
When
Wed Nov 11, 7:00 am to 3:30 pm
Where
Lakeview Water District, Mendota, IL
Crew
Sarah Mitchell, Tyler Bennett
Kit
Fluke 1587 insulation tester, laptop with PLC cable

Tyler Bennett is also booked at Riverside Bridge that afternoon.

Checklist 3 of 6
  • Lockout and tagout confirmed with operator
  • VFD parameters backed up
  • Level sensor calibrated, 0 to 20 ft
  • Lead and lag pump changeover tested
  • Alarm call-out tested end to end
  • Punch list photos uploaded
TaskMonTueWedThuFriTotal
PSC-12 HMI screens4605318
PSC-15 Site commissioning008.5008.5
SUB-39 SCADA point list3203412
Internal, training100012
Sarah Mitchell888.58840.5
November: submitted, waiting for Jordan Carter
Hours against estimate, active projects
Substation Upgrade1,180 h
Riverside Bridge640 h
Pump Station Controls705 h
Firmware 3.2512 h
Plant HVAC236 h
Hours loggedAhead of planWhere the plan says you should be

Everything an engineering team runs on

From the first proposal hour to the closeout report, for project managers, engineers on the board, site crews and the client.

  • Projects

    Boards and task lists

    Kanban per project with required fields per status, labels, disciplines, blocked reasons and hours against estimates.

  • Schedule

    Gantt timeline and milestones

    Every task on a timeline with today marked, plus milestones for design reviews, submittals and handover.

  • People

    Team load

    A 12-week heatmap of planned hours against each person’s capacity, with over-capacity warnings.

  • Time

    Timesheets and approvals

    Month and week views, monthly submission, manager approval or return, and months that lock once approved.

  • Field

    Site visits

    Crew, dates, location and a checklist for every deployment, with warnings when someone is double-booked.

  • Equipment

    Asset register

    Test gear and tools with serial numbers, check-out and return, location and next service date.

  • Reports

    Charts and CSV export

    Hours by project and discipline, utilization, budget burn, task status and overdue work, all exportable.

  • Setup

    Your own fields and workflow

    Add custom fields to projects, tasks, people and assets. Rename statuses and labels to match how you work.

  • Audit

    Activity log

    Every approval, role change and deletion is recorded with who did it and when. Nobody can edit the log.

Everyone sees only what their role allows

Permissions are checked by the database, not only by the screens, so a client viewer can never edit a task and an engineer can’t approve their own hours.

  • The screen locks after 5 idle minutes and asks for your lock code
  • Passwords are stored as salted hashes, never as plain text
  • Five wrong sign-in attempts lock the username for 15 minutes
  • Each firm’s data is kept apart from every other firm’s
RoleWhat they can do
OwnerEverything, including making someone else an owner
AdminInvite people, change roles, custom fields and the workflow
ManagerCreate projects and milestones, approve timesheets, schedule site visits, register equipment
EngineerWork on tasks, move cards, log their own time, check out equipment
ViewerRead-only access to projects, boards and reports. Made for clients

Simple monthly pricing

One price per firm, not per seat, so you can add the site crew and the client without counting licenses.

Starter

For small practices and single project teams

$39a month

  • Up to 8 people
  • Unlimited projects and tasks
  • Boards, lists and Gantt timeline
  • Timesheets with monthly approval
  • Team load for 12 weeks
  • Reports with CSV export
  • Email support
Start free trial

Firm Most picked

The full platform for growing engineering firms

$129a month

  • Everything in Starter
  • Up to 40 people
  • Site visits with checklists and clash warnings
  • Asset register with check-out and service dates
  • Custom fields, statuses and labels
  • Read-only client viewer seats
  • Activity log of every change
  • Priority support
Start free trial

Enterprise

For multi-office firms, utilities and owners’ teams

Customquote

  • Everything in Firm
  • Unlimited people
  • Several offices and business units
  • Single sign-on
  • Your own database region and backups
  • Help moving projects from your old system
  • A named account manager
Talk to us

Prices in USD before tax, billed monthly. Cancel any time. Starter and Firm start with a 14-day free trial.

FAQs

What engineering managers ask us most.

Does Keystone replace Microsoft Project or a spreadsheet?

For most firms, yes. Keystone keeps the schedule, the task board, the hours and the people on the same records, so the Gantt chart always matches what the team is doing. You can still export any report to a spreadsheet.

Can our clients see their project?

Yes. Invite them as a Viewer. They see the boards, timeline, milestones and reports for your workspace but can’t change anything.

How are hours checked against estimates?

Every task has an estimate. Hours logged in timesheets roll up to the task, the project and the discipline, and tasks that go over their estimate are flagged on the board and in reports.

Does it work on a phone at site?

Yes. Keystone runs in the browser and is laid out for phones and tablets, so crews can tick off checklists, log hours and check out equipment from the field. Nothing to install.

What happens if I walk away from my desk?

After 5 minutes without activity Keystone locks the screen. You unlock it with a 4 to 8 digit lock code you set, and five wrong tries sign you out.

Where is our data kept?

In a Postgres database with row-level security, so each firm’s records are kept apart and every permission is enforced on the server. Enterprise customers can choose the database region.

Book a demo

See Keystone set up for a firm like yours. We’ll walk through the board, the timeline, team load and timesheets in 30 minutes, then answer your questions.

  • A live walkthrough on Zoom, Google Meet or Teams
  • One of your real projects set up as an example
  • Help moving projects and people from your current tools

Rather look around on your own? Start a free workspace and load the sample projects from Settings.

Best time